Mooring Deployment

By Anne-Sophie Fortin After mooring recovery, maintenance, and calibration it is now time for mooring deployment. The moored instruments are fixed in intervals on a very long cable as we want to measure water mass fluxes from the surface to the ocean floor. Thus, to deploy a mooring, we need to steam slowly as we […]